This project involves resurfacing and 2
major slide repairs on 5.21 miles of
Interstate 90 beginning at mile post 40.12
between Sheridan and Buffalo, Wyoming. The
original contract amount was $19,183,206.40
and was awarded to Oftedal March 15, 2007.
Work began on the job last spring (2007) and
the majority of the grading work (slide
repairs) and resurfacing of the west bound
lanes was completed during that year. With
extraordinary amounts of spring snow
delaying the project initially, much of the
work was accomplished utilizing a double
shift. Thanks to these efforts (and a
relatively mild fall), the paving work was
completed prior to winter shut down. |
|
Sheridan Buffalo Project Detail |
|
| |
|
|
MORAN
JUNCTION - DUBOIS ROAD (BROOKS LAKE SECTION) |
|
In January of
2006, WDOT awarded Oftedal a two year
contract to reconstruct a 13.5 mile section
of US 287 between Moran Jct. & Dubois, WY.
When complete, Oftedal will have self
performed the excavation and grading of 1.5
million CY of earth, processed over 300,000
tons of crushed base and 170,100 CY of sub
base, installed over 5 miles of pipe
and culvert ranging from double cell 10' x
10' reinforced concrete box culverts to 24"
corrugated metal drain pipe, constructed
four geogrid reinforced fills and repaired
four slide sections situated in steep,
rugged terrain. |
|
| |
|
|
Moran
Junction - Dubois Road (Brooks Lake Section) Project
Detail
Project team
receives
national quality
award
|
| |
|
|
WEST ANTELOPE FLOOD CONTROL
STRUCTURES |
|
|
In October
2006, Oftedal began construction on four
earthen flood control structures designed to
retain or divert storm water from expanding
coal mine operations. By February 2007, over
2 million CY of earth were moved completing
construction of a three mile diversion
channel. |
 |
|
West Antelope Flood Control
Structures Project Detail |
|
| | |
|
COUNTY LINE WEST (I-25 RECONSTRUCTION) |
|
|
Reconstruction of a five mile section of
I-25 in Converse and Natrona counties
required widening both the north and south
bound lanes, filling median ditches and
recontouring shoulders. Oftedal placed over
900,000 CY of material using scrapers, haul
trucks, and belly dumps. |
 |
County Line West Project