Grading & Excavation
Materials Hauling
Pipe & Culvert Installation
Aggregate Production
 
 

 

PROJECTS

   

MORAN JUNCTION - DUBOIS ROAD (BROOKS LAKE SECTION)

In January of 2006, WDOT awarded Oftedal a two year contract to reconstruct a 13.5 mile section of US 287 between Moran Jct. & Dubois, WY. When complete, Oftedal will have self performed the excavation and grading of 1.5 million CY of earth, processed over 300,000 tons of crushed base and 170,100 CY of sub base,  installed over 5 miles of pipe and culvert ranging from double cell 10' x 10' reinforced concrete box culverts to 24" corrugated metal drain pipe, constructed four geogrid reinforced fills and repaired four slide sections situated in steep, rugged terrain.

 

   

  Moran Junction - Dubois Road (Brooks Lake Section) Project Detail

Project team receives national quality award

   

WEST ANTELOPE FLOOD CONTROL STRUCTURESS

In October 2006, Oftedal began construction on four earthen flood control structures designed to retain or divert storm water from expanding coal mine operations. By February 2007, over 2 million CY of earth were moved completing construction of a three mile diversion channel.

 

  West Antelope Flood Control Structures Project Detail

 
  

COUNTY LINE WEST (I-25 RECONSTRUCTION)

 

Reconstruction of a five mile section of I-25 in Converse and Natrona counties required widening both the north and south bound lanes, filling median ditches and recontouring shoulders. Oftedal placed over 900,000 CY of material using scrapers, haul trucks, and belly dumps.

  County Line West Project Detail 
  
  